DELIVERY PROCESS

Od projektu do produkcji

Przejrzysty proces stage-gate od zatwierdzonych informacji inżynierskich do kontrolowanego wydania.

STAGE-GATE MODEL

FROM DESIGN TO FABRICATION.

01

Receive & Review

Fabnera receives approved engineering drawings, specifications, applicable standards, ITP / quality requirements where applicable, project requirements and fabrication requirements. Missing information generates a formal RFI rather than undocumented assumptions.

Approved engineering drawings
Project specifications
Applicable standards (e.g. EN 1090-2)
ITP / quality requirements
Fabricator requirements
Connection information
02

3D Modelling & Detailing

The detailed fabrication model is constructed in Tekla Structures based on approved project information. RFIs are raised for any missing or conflicting information before the affected work proceeds.

Verified project requirements from Gate 01
Resolved RFI responses
Tekla model standards and templates
03

Review & Approval

Model information and required drawing packages are submitted for client / engineer review and approval according to project requirements. Package-based approvals are supported — review is not deferred to end of project.

Drawing package submission
Model status report
RFI log
04

Check & Quality Control

Fabnera's structured QC checklist is applied covering: model completeness, geometry, member and assembly marks, materials, bolts, welds, holes, clash check, drawings, BOM, NC/DSTV data, revision status and applicable project requirements.

Detailer sign-off
QC checklist completion
Checker independent verification
05

Fabrication Release

Only controlled and QC-approved packages are issued as final fabrication documentation. Superseded revisions are clearly identified and separated. Errors attributable to Fabnera are corrected without additional charge.

QC-passed package
Approved drawing status
Release register

QUALITY SYSTEM

CONTROLLED BEFORE RELEASE.

A structured checking sequence is applied to every fabrication package before final issue.

01
DETAILER
PASS
02
MODEL CHECK
PASS
03
DRAWING CHECK
PASS
04
BOM / NC CHECK
PASS
05
REVISION CONTROL
PASS
06
CHECKER
PASS
07
RELEASE
RELEASED

Errors or omissions attributable to Fabnera are corrected without additional charge. Revisions requested due to design changes or additional client scope are subject to commercial review.

REVISION MANAGEMENT

EVERY REVISION TRACKED.

All documentation is revision-controlled throughout the project. Superseded drawings are clearly identified and separated from current fabrication information.

Fabrication should never proceed from superseded documentation. Fabnera's revision management ensures the current status is always clear.

R01 For Review SUPERSEDED
R02 Approved as Noted — Comments Incorporated SUPERSEDED
R03 Approved — Released for Fabrication CURRENT

REQUEST FOR INFORMATION

WE DON'T GUESS.

When engineering information is incomplete, conflicting or missing, Fabnera raises a formal RFI and waits for resolution before proceeding.

Information Gap
Conflict or omission identified
RFI Raised
Formal RFI issued to EOR / client
Response
Clarification received in writing
Detail Updated
Model & drawings updated
QC & Release
Change verified, revision issued

NEXT STEP

Ready to submit a project for technical review?

Approved engineering information transformed into controlled, fabrication-ready documentation.